Rain is still sl0wing us down. But we’ve made some progress. The house is fully taped. Rob’s guys are preparing it for the blower door test on Monday, buy installing the basement door and caulking and caulking. Being sheathed with no windows makes it very dark inside, thus it’s easy to see light coming in any openings. The front step arrive tomorrow. The garage is prepped for the floor to be poured tomorrow. And my work vehicle has arrived. Once the blower door test is done we start the roof, followed by the siding……….
Monthly Archives: December 2015
Garage sided
Singing in the Rain
I could cry, but what good sill that do. For those not on the right coast, we’re in a period of about 10 days of rainy stuff. So the blower door test has been pushed out at least a week. You can see the sheathing is done. 🙂 but no taping. And the Amish guys working on the garage, drive out from East Earl Lancaster county to get a half a days work done before getting drenched. So, we can’t dance, to wet to plow, so we might as well sing Christmas Carols.
A Lost week
As it turned out the roof ZIP sheathing was backordered and didn’t show up till late Wednesday. Thursday was nothing but rain so no work got done. Friday was a beautiful day and the sheather’s were on side before 8:00. I was expecting it be a one day job. I had errands to run and to head back to New London to finish packing so I left around 10:00. I arrived this afternoon (Sunday) around 4:00 expecting the house to be fully sheathed. But it wasn’t, I’m guessing they ran out of roof sheathing. Here are some photos. I have rescheduled the first blower door test out a week to 12/29. Note we are sheathing everything but the front door for the first blower door test. The garage material showed up on Friday, and they plan to get started Monday. The windows were delivered Wednesday.
Let the sheathing begin.
The sheathing behind the porch roof needed to be installed before these roofs could be framed. And before the sheathing gapes needed to be caulked with the never harding “Acoustical Caulk”. Supper sticky and black. Then “blocking” needed to be added between the studs to allow the sheathing to be nailed property on 3-6″ centers The sheathing is ZIP R-6, it puts an R-6.6 insulation on the outside of the framing and helping to minimize the thermal bridging. Note how the sheathing goes behind the roof over hangs to create an envelop of insulation around the exterior of the house.
Tomorrow the final delivery of the sheathing will arrive and the full sheathing will happen at full bore.
The Shed arrives
Today our garden shed arrived. In the fog, but ahead of the pending rain. A better driver the me, he backed up the 300 foot driveway. Then the big challenge getting up from the parking area pad to the shed pad. There was some mud and a ditch to cross. The driver was amazing, pulse the trailer had a fifth wheel and a built in motor to move it sideways. Then the thing they called a mule got it to it’s final position. See the photos.
The Framing goes on
Today no big changes. They finished the roof over the family room and the window end of the family room. And roof over hangs and final exterior framing. Monday they plan to start sheathing. Weather permitting the shed get delivered Monday, and windows Wednesday. And we are shooting for the first Blower door test the following Monday.
Backfill and roofs
Today it’s starting to look like a house. The rafters and dormers on the second floor bedroom section are done. The roof rafters 18′ x 12″ TJIs were a challenge to get up. It took much longer than the framers though. You can see from yesterday’s photos how they had to swing them into place. It also looks like we can’t use the window designed for the second bathroom because of the angle of the porch roof. We will swap it with a smaller one form the office.
Backfill and rough grading is done and a pad is set up for the shed.
Back
Family Room end
Front
Office end
Shed pad
Busy Monday (Backfill & Framing)
In the first photo the Bilco door crew was still on site, the excavators started backfilling and the framers were working on the roof rafters. Look how long the rafters are and the framer swing them into position to be lifted up. A very uneventful day other than it was the first day of Deer season and shotguns were going off in the distance and deer were running around.
Three things at once.
Second floor framing
Backfill
End of Day