Basement Floor

I got to the lot at 8:02 and Marone’s guys were already working.  Two concrete trucks later the floor was poured, Spread it out, shot the height with a laser, then let it set up. After a few hours they were back at it smoothing the floor and cutting the expansion join. Gabe my Grandson can over to watch and the pump truck operator let him move the boom around,

65 Basement Floor65 Basement Floor (3) 65 Basement Floor (2) 65 Basement Floor (4) 65 Basement Floor (5) 65 Basement Floor (6) 65 Basement Floor (10) 20151127_090032-1

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s